This section collects a series of Case Studies performed by NINE experts. As “Case Studies,” they include specific and well-defined technical activities carried out in the framework of service contracts, with a diverse range of scopes and objectives and generally involving skills and competences from different technical areas.
In order to assist the reader with identifying the Case Studies of interest, a cross-reference table has been developed where each Case Study is assigned one or more of the following attributes:
•    Code and Methodology Development and Validation;
•    Licensing Applications;
•    Independent Assessment (Safety and Design);
•    Experimental Activities (indication is given of the relevant);
•    Technical Area;
•    Reference Technology;


CASE STUDIES DESCRIPTION

Code and Methodology Development & Validation tab

 # 

Case Study Description

   Code and Methodology

Development & Validation

 

Licensing Applications

Independent Assessment

     (Safety and Design)

Experimental Activities

Technical Area

 

 

 

Reference Technology

 

1
BEPU Safety Demonstration for Atucha II NPP Licensing spunta verde   spunta verde     PTH,CB,FSM,SA  PHWR
3
 Analysis of Large Break LOCA in Atucha II NPP  spunta verde  spunta verde     PTH, CB, FSM, SA   PHWR
4
 CFD Studies in Support of Atucha II NPP Licensing  spunta verde  spunta verde spunta verde   spunta verde FSM, CB, PTH, EXP  PHWR 
5  Reactor Physics Analysis for Atucha II NPP  spunta verde  spunta verde      CB  PHWR
8  HPR-1000 Development of Emergency Operating Procedures  spunta verde    spunta verde     PTH LWR
9  VVER-1000 Safety Analysis: Experimental Tests for Code Qualification  spunta verde   spunta verde spunta verde   PTH VVER 
16  RELAP5 Simulation of Darlington NGSLoss of Flow Event  spunta verde   spunta verde    PTH CANDU 
18  LABGENE Core Design Review  spunta verde  spunta verde     CB, PTH   LWR, SMR
19  Two-phase Natural Circulation Instability Analysis for Passive Auxiliary Feedwater System (PAFS) in APR+  spunta verde   spunta verde   PTH   GEN III
20  EBR-II SHRT-17 Test Thermal-Hydraulic Simulation  spunta verde       PTH  GEN IV
21  SMART Code Independent Assessment  spunta verde   spunta verde   PTH, SA  CANDU 
24  Severe Accident Code Application to Sandia Spent Fuel Pool Tests spunta verde        PHT, SA  LWR